Download Print this page

EMC CelerraNS-120 Installation Manual page 19

Advertisement

Cabling the EMC Celerra NS-120 system
Cable the NS-120 disk-array enclosure (DAE) cables.
Storage processor (SP) A latch down (bottom SP)
Link control card (LCC) A
E X P
P R I
LCC A PRI
PRI A connector
Storage processor (SP) B latch up (t op SP)
Link control card (LCC) B
P R I
E X P
PRI B connector
PRI B connector
Latch side up
LCC B
Disk-array
B
enclosure (DAE)
A
Storage processor
enclosure (SPE)
Pull/release tab
SPB B0 Port 0
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
Pull/release tab
1
SPA A0 Port 0
Pull/release tab
2
LCC B PRI
SPB B0 Port 0
PRI A connector
Latch side down
LCC A
PRI
#
LCC B
LCC A
PRI
Control Station (CS)
Standby power supply (SPS)
Blade enclosure
21FC-22FC
Pull/release tab
2
B
A
B
A
B
A
SPA A0 Port 0
1
19
Disk-array enclosure
DAE
DAE
Control Station (CS)
Standby power supply (SPS)
Blade enclosure
21FC-22FC
CNS-001451MOD

Advertisement

loading