Download Print this page

EMC CelerraNS-120 Installation Manual page 10

Advertisement

Install rails into site rack from the front
Note: The ganged rails must be aligned carefully. Two people are required to install the components.
1. Insert the rail slide and seat both rail extensions into the rear channel of your rack. We
recommend placing the top rail pin into the hole just above a National Electrical Manufactures
Association (NEMA) Unit (U) marker.
2. Align the front of the ganged rail as shown below. Insert two retention screws in the front and
back of each rail. See the following illustration.
3. Do not fully tighten the retention screws yet. Allow some adjustment space for the installation of
the components.
Install the retaining screws
2nd screw hole
from the top of the rail
1 Unit = 1.75 in.
Install the retaining screw in
hole 2 of the rail.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
After inserting the rail
extensions, install 2 screws
on each side of your rack
to hold the rails in place.
Threaded
screw holes
Detail
ganged rails
1
1
2
3
3
7
4
10
5
13
6
16
7
17
8
18
9
19
10
21
11
22
12
23
Ganged rail slide
Threaded
screw holes
Install 2 retaining screws
on each side of your rack
to hold the rails in place.
Front of rack
5th screw hole
from the bottom
of the rail
2nd screw hole
from top
5th screw hole
from bottom
10
Rear of rack
CNS-001455MOD

Advertisement

loading