wsm RC60-27BR Workshop Manual page 52

Table of Contents

Advertisement

RCK54/60-24B-EC · RCK60-27B-EC · RC60-24/27BR, WSM
Center Pulley Holder
1. Unscrew the center pulley holder screws (1), and remove the
center pulley holder from the mower deck.
2. Remove the upper oil seal (10) and lower oil seal (8).
3. Remove the internal snap ring (7), ball bearings (4), (6) and collar
(5).
NOTE
• The collar (5) adapts to RC60-27BR only.
(When reassembling)
• Replace the oil seals (8), (10) with new ones.
Tightening torque
Center pulley holder screw
(1) Center Pulley Holder Screw
(2) Gear Box Stay RH
(3) Center Pulley Holder
(4) Ball Bearing
(5) Collar
S-14
ROTARY MOWER
77.6 to 90.2 N·m
8.0 to 9.2 kgf·m
57.1 to 66.5 ft-lbs
(6) Ball Bearing
(7) Internal Snap Ring
(8) Oil Seal
(9) Gear Box Stay LH
(10) Oil Seal
W1019050
KiSC issued 11, 2006 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rck60-27b-ecrc60-24brRck60-24b-ecRck54-24b-ec

Table of Contents