Installing The 1U Air Duct Option; Mounting Kit Components - IBM G8000 Installation Manual

Hide thumbs Also See for G8000:
Table of Contents

Advertisement

7. Connect all the cables.
8. Initialize the switch, see Chapter 4, "Initializing the RackSwitch," on page 45.

Installing the 1U air duct option

The RackSwitch supports an optional 1U air duct to maximize air flow conditions in
a 19" rack. For 1U air duct option part numbers, see the Chapter 6, "Replaceable
switch parts," on page 53 section.

Mounting kit components

The 1U air duct option ships with:
v One 1U air duct unit
v One 1U air duct mechanical assembly kit
v One power cord
The following table lists the parts included with the 1U air duct mounting kit.
28
IBM System Networking RackSwitch G8000: Installation Guide
Attention:
If this is a switch replacement, make sure that the vital product
data (VPD) is updated to avoid losing the licensed electronic entitlement data of
the RackSwitch. For more information, see "Configuring Vital Product Data after
a switch replacement" on page 43.
Table 18. 1U air duct mounting kit
Item number
1
2
3
4
5
7
1
Description
Cable tie
1U Duct sleeve (long)
Mounting bracket, right,
assembly, 1U duct
Mounting bracket, left,
assembly, 1U duct
Foam carrier assembly,
includes half shears and
foam carrier
Quantity
4
1
1
1
2

Advertisement

Table of Contents
loading

Table of Contents