Instructions for kit #71K
Edge of the Base Floor
Housebody Assembly:
the Foundation and Base Floor
□
1. Glue and nail together the Foundation perimeter
with the Long Foundations (31
Middle Foundations (15
5
□
2. Glue and nail the rest of the Middle Foundations
within the Foundation Perimeter, spaced evenly.
Pro Tip: It is easiest to glue the Nosing onto the Floors
now (see page 10), but it takes more space. The Nosing
is vulnerable until the house is built; the floors can't be
stacked or moved without great care. If you have lots of
space to keep the floors safe and to lay them out for paint-
ing (see Section 4), attach the Nosing now. Otherwise, keep
the Nosing bundled and protected until the house is built.
□
3. Glue, tape, and nail the Base Floor to the Founda-
tion set, lined up at the back edge, with the bevels to the
front, and spaced evenly side-to-side.
Weight the Base and Foundation set to lay abso-
lutely flat on a flat worksurface as the glue dries. Getting
the Base assembly flat is necessary for a flat house!
□
4. Glue and tape the Bay Foundation set together
and to the Base and Foundation, lined up with the bevel
and spaced evenly under the floor.
Let the glue dry
9
/
) overlapping the
16
/
).
8
Foundation and Base Floor (1) page 6