Test And Verify Tilt Circuit - Skyjack SJ 3215 Service Manual

Scissor lifts
Hide thumbs Also See for SJ 3215:
Table of Contents

Advertisement

Service and Maintenance
i.
T h e
g r e e n
w i l l t u r n o n s o l i d .
Results: The switch
is ready for normal
operation.
10.
Turn main disconnect switch to "
position.
11.
Remove jumper wire between #7 and #19 from
terminal block.
12.
Reattach all wires #02 to motor contactor.
13.
Reinstall any covers that was removed.
14.
Remove chock or wheel blocks.
15.
Proceed to Test and Verify Tilt Circuit.
SKYJACK, Page 10
L E D
Red LED
Green LED
" off

Test and Verify Tilt Circuit

Set up button is located on this
Light Indicators
Operations of Tilt Switch
The following describes the LED's and what they
indicate.
Illuminated whenever both tilt
axes are within the specified
degrees of the zero/ home
learned position.
Green LED
Flashes when transitioning in
or out of tilt angle limits, but
built in time delay has not fully
occurred.
Illuminated whenever tilt on one
or more axes is more than the
Red LED
specified degrees out from the
zero/ home position.
On together, no blinking when
Green & Red LED
fault detected.
Tilt Circuit Test
1.
Refer to section 2 for test tilt sensor procedure.
Section 5 - Procedures
face next to harness
SJIII Series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj 3219

Table of Contents