Download Print this page

ESAB EPP-200 Instruction Manual page 93

Precision plasmarc cutting system
Hide thumbs Also See for EPP-200:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 245
SECTION 3
INSTALLATION
9. Connect input conductors to line (wall) disconnect.
10. Replace side panel. Replace only if all connections have made.
Output connections require this panel to be removed.
11. Connect the other end of work cable to workpiece or cutting table.
Connection must be made to a clean, exposed metal surface, free of
paint, rust, mill scale, etc.
Work ground to work piece
Work ground to cutting table
Electric Current Is Hazardous.
WARNING
It is important to have a good earth ground connected to the
workpiece or cutting table.
93

Advertisement

loading