Carrier MMY-MAP0724FT9UL Service Manual page 253

Multi type super heat recovery multi-i
Table of Contents

Advertisement

(7) Install the service P.C. boards (A) and (B) in the outdoor unit controller.
(Make sure that they are firmly secured to the card edge spacers (
(8) Securely connect the service P.C. boards to the chassis using the earthing screws (
If either of the screws is loose, it will pose a risk of device failure by degrading noise control, so take care
while engaging in the work.
Nevertheless, do not use an electric or pneumatic screwdriver under any circumstances as it may lead to
component damage.
(9) Connect the wiring using the connectors and fast-on terminals removed in step (3).
Make sure that the connectors and fast-on terminals are connected correctly and securely.
(10) If any component on the P.C. board becomes crooked during replacement, straighten it without touching
any other component.
(11) Mount the terminal block sub-assembly (
(12) Securely connect the red, white and black leads from the service P.C. board (A) to the power supply
4
terminal block (
) using the screws (
(13) Put the cover on, turn on the power, and check operation.
1
) and firmly secure it using the screws (
2
).
Close-up view of screw-on terminals ( 8 )
Screw tightening torque (ft•lbs)
Screw diameter
M6
M4
M3
– 253 –
7
).)
5
6
), (
) removed in step 4.
3
).
Torque(ft•lbs)
1.84
0.89
0.37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents