Installation of the GSD file in Step 7 Manager

1
Installation of the GSD file in Step 7 Manager

1.1 Creating a project

4
This installation manual is only for persons who are familiar
with the Siemens Simatic S7 PLC.
Prerequisites:
The installation package (such as "Delta_S7_function_block" or Gamma‐
Sigma_S7_function_block"), with the GSD file (such as prom0B02.gsd")
must have been downloaded from the
installation package for the respective product is there.)
The installation package must be open on the PC and the GSD must be
copied from the installation package into a folder.