Toro TX525 Service Manual page 351

Hide thumbs Also See for TX525:
Table of Contents

Advertisement

HYDRAULIC SYSTEM
19. Position the pivot joystick joint into the pivot and
install the nut. Torque the nut to 31 ft-lbs. (42 Nm)
(Fig. 1167).
20. Apply blue thread locking material to the threads of
the joystick pin (Fig. 1168).
6-88
Fig 1167
PICT-2651a
Fig 1168
PICT-2652a
21. Position the joint pin into the tilt spool and install the
nut. Torque the nut to 31 ft-lbs. (42 Nm) (Fig. 1169).
22. Install the end rod onto the joystick pin (Fig. 1170).
Rev. 000
Fig 1169
PICT-2653a
Fig 1170
PICT-2654
TX525 Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents