Content Table of Content Chapter 1 Information of S2116 Switch..........................1 1.1 Standard configuration ............................1 1.2 S2116 Switch System Properties Parameters....................... 2 Chapter 2 Preparing for installation ............................4 2.1 Safety notice................................4 2.1.1 Ensure safety as the following principals ....................4 2.1.2 Safety warnings............................
BDCOM S2116 Switch Hardware Installation Guide Chapter 1 Information of S2116 Switch This section explains the parameters of S2116 switch. 1.1 Standard configuration S2116switch standard ports consists of 2 parts: 16 fast Ethernet interfaces and 1 Console interface. Refer to the following table:...
BDCOM S2116 Switch Hardware Installation Guide Indicator lights when the port is in 100M. Indicator dies out when the port is in 10M. 10/100-Base-T Implement 10/100 methenet signal interfaces transformation SLOT1 Extended Ethernet slot 1 The rear-panel of S2116 switch is shown as below:...
Page 5
BDCOM S2116 Switch Hardware Installation Guide 10/100Base-TX; 100Base-FX; Cards module 340mm×220mm×44mm Dimension Temperature/H 0℃~60 ; 10% ~85% without air conditioning umidity for ℃ working Temperature/H -40℃~80 ; 5% ~95% without air conditioning umidity for ℃ storage Input Voltage: AC100~240V; Input frequency: 47~63Hz...
BDCOM S2116 Switch Hardware Installation Guide Chapter 2 Preparing for installation The following discusses the considering cases of switch installation, includes two sections: Please continre to read "switch Installation" after reading this section. 2.1 Safety notice 2.1.1 Ensure safety as the following principals Keep the chassis areas clear and dust-free during and after installation;...
BDCOM S2116 Switch Hardware Installation Guide Before working on equipment that is connecting to power lines , remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connect to the power and ground and can cause serious burns or can weld the metal objects to the terminals.
BDCOM S2116 Switch Hardware Installation Guide unwanted ESD voltages to ground.To properly guard against ESD damage and shoaks,the wrist strap and cord must be used effectively.If no wrist strap is available, ground yourself by touching the metal part of the chassis.
BDCOM S2116 Switch Hardware Installation Guide When mounting a chassis in an open rack ensure that the rack frame does not lock the intake or the exhaust ports. So check the position of the chassis when it is seated all the way into the rack.
BDCOM S2116 Switch Hardware Installation Guide Chapter 3 Installing switch This section explains the detail of S2116 Switch installation: Warning: Only qualified mechanics are allowed to install or replace the device. 3.1 Installation tools and devices Tools and devices needed for S2116 switch are optional devices. Users have to buy according to their needs.
BDCOM S2116 Switch Hardware Installation Guide Mount the switch after the brackets are fixed. Refer to the following illustration: 3.3 Connecting Console port There is a console port on S2116 switch. This section explains the features and usage of the port.
BDCOM S2116 Switch Hardware Installation Guide Console port pins are as follows: Pin No. Description Name Note Carrier detect No connect Received data Input Data set ready No connect Transmitted data Output request to send No connect clear to send...
BDCOM S2116 Switch Hardware Installation Guide 3.4 Connecting Fast Ethernet Interface S2116switch provides 24 10/100Base-TX ports. Each port is embedded with 2 LEDs to indicate the statues of Link/ACT and 10/100M. Use switchUTP to connect to other Ethernet terminals. UTP No. and console No. are the same. Refer to the following chart..
Page 14
BDCOM S2116 Switch Hardware Installation Guide Data receive positive TPRXD+ Input Data receive negative TPRXD- Input Figure 3-1 Parallel connection UTP5 Note: Cable connection and colors follow the regulations in EIA/TIA 568A. Figure 3-2 Cross connection UTP5 Note: Cable colors follow the regulation in EIA/TIA 568A.
BDCOM S2116 Switch Hardware Installation Guide Chapter 4 Hardware Troubleshooting 4.1 Trouble analyzing The key to troubleshooting is to separate trouble from the system. By analyzing what system should do and what system is doing, troubleshooting becomes easy. Think of the following systems while analyzing troubles: Power and cooling system—Power and cooling fan;...
Page 16
BDCOM S2116 Switch Hardware Installation Guide Indicator lights when the system is turning on. System Indicator Indicator blinks when the system is functioning. Indicator lights when link status is normal. Indicator embedded on the left side of each Indicator blinks when data is being sent or port.
BDCOM S2116 Switch Hardware Installation Guide Chapter 5 Switch Maintenance Warning: Ensure static electricity emission of your body before openning the chassis. Please read “Safety Notices” before any operating in appendixB after closing the switch.. Please unlatch power pin when operate near or on the Switch.
BDCOM S2116 Switch Hardware Installation Guide When the top is off, set it aside and it shows the layout of system cards Note: Put down the top steady avoiding any demage after lifting it, otherwise it will be very difficult to install later.
Page 19
BDCOM S2116 Switch Hardware Installation Guide The top section fits into the bottom section. The bottom section fits into the front of the top section. Each side of the top and bottom sectionfits together. Replace and tighten the top screws by the screw-driver as picture 2;...