Download Print this page

Heatscope MHS-VT1600WT.100 Installation And Instruction Manual page 5

Heatscope spot, heatscope vision
Hide thumbs Also See for MHS-VT1600WT.100:

Advertisement

Available languages

Available languages

A M B I E N T H E A T I N G S O L U T I O N S
15. Disconnect the radiant heater from the power supply before cleaning it, adjusting the angle or
removing it from the wall/ceiling. Wait until the heating elements are not glowing any more and the
housing is noticably cooled down. If buried cables are used, switch off the power using an omnipolar
switch. Wait at least 30 minutes after the last use before you start cleaning it. All surfaces should be
cleaned using a damp cloth only. Never use cleaning products containing alkaline substances such as
sodium hydroxide or soap, surfactants or solvents such as alcohol. Use only a very soft cloth or a brush
for the reflector and the heating elements.
16. Always remember to switch off the unit after use.
US
Phone: 001-310-9295333-1001 · Fax: 001-310-7335070 · E-Mail: info@greenchance.net · www.greenchance.net

Advertisement

loading