Install Horizontal Termination Cap
WARNING! Risk of Fire! The telescoping flue section of
the termination cap MUST be used when connecting vent.
1-1/2 (38 mm) minimum overlap of flue telescoping
section is required.
Failure to maintain overlap could cause overheating
and fire.
 Vent termination must not be recessed in the wall.
Siding may be brought to the edge of the cap base.
 Flash and seal as appropriate for siding material at
outside edges of cap.
CAUTION! Risk of Burns! Local codes may require in-
stallation of a cap shield to prevent anything or anyone
from touching the hot cap.
NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a flashing kit
and HRC caps are available. When penetrating a brick
wall, a brick extension kit is available for framing the brick.
Note:
When using termination caps with factory-supplied
heat shield attached, no additional wall shield firestop is
required on the exterior side of a combustible wall.
HEAT SHIELD OR
EXTENDED
HEAT SHIELD
WALL SHIELD
FIRESTOP
SLIP SECTION
CAN BE EXTENDED
INNER VENT
OUTER VENT
Figure 7.15 Venting Through the Wall
Heat & Glo • MEZZO-1000-AU, MEZZO-1300-AU, MEZZO-1300ST-AU, MEZZO-1600-AU Installation Manual • 2304-970 Rev. D • 3/15
36
HEAT SHIELD
1-1/2 IN. (38 MM) MIN.
OVERLAP
SHEATHING
INT ER IO R
EXT E R IO R

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mezzo-1300st-auMezzo-1300-auMezzo-1600-au

Table of Contents