Heat & Glo MEZZO-1000-AU Installation Manual page 26

Hide thumbs Also See for MEZZO-1000-AU:
Table of Contents

Advertisement

WARNING! Risk of Fire!
DO NOT attach elbow directly to the appliance.
The MEZZO-1000-AU, MEZZO-1300-AU, MEZZO-1300ST-AU, MEZZO-1600-AU require a minimum of 24 in. (610 mm)
of vertical venting before attaching any elbow to the appliance.
MEZZO-1000-AU, MEZZO-1300-AU,
MEZZO-1300ST-AU, MEZZO-1600-AU
V
+ V
Minimum
1
2
2 ft.
610 mm
3 ft.
914 mm
4 ft.
1.2 m
5 ft.
1.5 m
V
+ V
+ H
+ H
= 63 ft. (19.2 m) Maximum
1
2
1
2
H
+ H
= 23 ft. (7.1 m) Maximum
1
2
Figure 4.14
Heat & Glo • MEZZO-1000-AU, MEZZO-1300-AU, MEZZO-1300ST-AU, MEZZO-1600-AU Installation Manual • 2304-970 Rev. D • 3/15
Top Vent - Vertical Termination
Venting with 3 elbows
H
+ H
Maximum
1
2
4 ft.
1.2 m
9 ft.
2.7 m
12 ft.
3.6 m
15 ft.
4.5 m
Note
: Use DVP Series
components only.
V
2
H
H
2
INSTALLED
HORIZONTALLY
1
V
1
2 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mezzo-1300st-auMezzo-1300-auMezzo-1600-au

Table of Contents