Use Of The Machine; Preparation Of The Machine - Profitec Pro 700 User Manual

Hide thumbs Also See for Pro 700:
Table of Contents

Advertisement

Available languages

Available languages

Bedienungsanleitung / User manual Pro700
Machine in use with direct water connection
1
Plug the machine into an electrical outlet. Place the brew lever into the upper position. Turn the machine
on by placing the metal switch in the upper position. The coffee boiler is now being heated and the green
control lamp will come on. In order to turn on the steam boiler as well, please press the right switch
(symbol: steam) located under the drip tray to position '1'. The orange control lamp now lights up.
Caution! Please make sure that the switch for the direct water connection (symbol: water tap) is in
position '1' (image 2). Otherwise the steam boiler will not fill with water. The machine is now on, the
pump is activated and is filling fresh water into the steam boiler. Both boilers are being heated in
succession.
2
As soon as water is discharged from the brew group, place the brew lever back into the lower position.
The coffee boiler is now filled with water.
3
As soon as the steam boiler is filled with water, no more pump noise will be heard and the PID-display
indicates the current temperature of both boilers (reg. item 3.3). Please wait until the pump pressure
gauge indicated a value of ca. 1.0 – 1.25 bars.
4
A manual boiler venting is not necessary because the Pro700 contains a professional Anti-Vacuum
valve, which vents the boiler during the heat-up phase. This venting procedure is done by way of the
discharge behind the brew group, directly into the drip tray. Caution, steam forms!
5
The machine is now ready for use. Put the cups on the cup heater tray in order to preheat them and
enjoy your coffee.
The PRO700 has a fuse to prevent the machine from overfilling.
It is possible that the machine does not heat up when using it for the first time or when
dispensing large quantities of water through the hot water valve. In this case, please switch
the machine off and on again.
6

USE OF THE MACHINE

6.1 Preparation of the machine

The switched off machine is to be placed into operation as follows:
Water tank machine or machine in use with water tank
1
Fill the water tank.
2
Make sure there is enough water in the tank.
3
Now turn the machine on (the metal switch in the upper position and the right switch behind the drip tray
in position '0').
4
Please wait until the desired coffee-, i.e. steam temperature, has been reached (value indicated on the
PID-display).
5
In general, the machine will be heated up in about 15 minutes, depending on the ambient temperature.
6
The machine is now ready for use.
7
Prior to preparing your first coffee, insert the filter holder and activate the brew lever in order to release
hot water and to heat the filter holder to an optimal temperature.
Machine in use with direct water connection
1
Please make sure that there is always water pressure in the water connection line.
2
Now turn the machine on (the metal switch in the upper position and the right switch behind the drip tray
in position '1').
3
Wait until the gauge indicates a value of 1.0 – 1.25 bars.
4
In general, the machine will be heated up in about 15 minutes, depending on the ambient temperature.
5
The machine is now ready to use.
6
Prior to preparing your first coffee, insert the filter holder and activate the brew lever in order to release
hot water and heat the filter holder to an optimal temperature.
7
It is recommended to leave the filter holder in the brew group, keeping it warm for optimum
temperature for coffee dispension.
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents