SECTION 18—FLOWMETER
Replacing Flowmeter
To prevent electrical shock, ALWAYS disconnect concentrator from electrical outlet
before servicing.
NOTE: For this procedure, refer to FIGURE 18.1 on page 63.
1. Unplug unit.
2. Remove cabinet. Refer to Removing Cabinet on page 23.
3. Note the location of the PVC tubing for accurate replacement after new flowmeter is
installed.
4. Remove control panel. Refer to Removing Control Panel on page 53.
5. Remove palnuts that secure flowmeter to the control panel.
6. Remove flowmeter from front of control panel.
7. Install new flowmeter reversing STEPS 4‐5.
8. Reinstall control panel. Refer to Removing Control Panel on page 53.
9. Run unit and check for leaks where ¼‐inch PVC tubing engages flowmeter barbed
fittings. Refer to Leak Test on page 76.
10. Reinstall cabinet. Refer to Removing Cabinet on page 23.
Flowmeter Barbed
Flowmeter
Control Panel
Part No 1164934
DANGER
Fittings (Back of
Flowmeter)
FIGURE 18.1
SECTION 18—FLOWMETER
Replacing Flowmeter
63
Palnuts
™
Perfecto
2
V