Nortel NN44200-300 Hardware Installation page 39

Nortel networks server hardware installation instructions
Table of Contents

Advertisement

Rack power and grounding
To ensure a complete power and grounding installation:
In rackmount server installations, ensure the CallPilot server chassis
and equipment racks are isolated from other foreign sources of ground.
Acceptable isolation methods include: isolation pads, grommeted
washers, chassis side rail strips, and non-conducting washers.
In rackmount server installations where other equipment is also installed
in the same 19" rack, ensure that all equipment derives ground from
Copyright © 2007, Nortel Networks
.
Nortel CallPilot
1002rp Server Hardware Installation
NN44200-300 01.01 Standard
5.0 23 February 2007
DC rack cabling 39
Nortel Networks Confidential

Advertisement

Table of Contents
loading

This manual is also suitable for:

1002rp

Table of Contents