4-Stroke Engine Installation - Hangar 9 Saratoga 40 Assembly Manual

Fly first class plane
Table of Contents

Advertisement

Step 21
Check the operation of the throttle from the radio to make
sure it goes from fully closed to fully open, and that the
servo is not binding at either endpoint as well. If you are
using a computer radio, use the endpoint adjustments
as necessary to fine-tune the operation of the throttle if
necessary.
20

4-Stroke Engine Installation

Required Parts
Fuselage assembly
Engine with hardware
Engine mount
Engine mount plate (2)
#8 washer (8)
8/32 lock nut (4)
Plywood pushrod support
Clevis
Clevis retainer
Pushrod keeper
8-32 x 1-inch machine screw (4)
8-32 x 3/4-inch machine screw (4)
16
/
-inch (419mm) throttle pushrod wire
1
2
12-inch (305mm) throttle pushrod housing
Tools and Adhesives
Phillips screwdriver: #2
Threadlock
Medium grit sandpaper
Ruler
Side cutters
Pliers
Z-bend pliers
Medium CA
30-minute epoxy
Drill bit: 5/64-inch (2mm), 5/32-inch (4mm)
Step 1
Open the bag marked Motor Mount. Set aside the four
48mm standoffs and four 8-32 x 2
/
-inch machine screws
1
4
for the Electric Power (EP) version as they will not be used
in the engine installation.
Step 2
Slide a #8 washer onto each of the 8-32 x 3/4-inch machine
screws. Apply a drop of threadlock on each screw.
Step 3
Slide the screws into the motor mount as shown.
Hangar 9 Saratoga Assembly Manual

Advertisement

Table of Contents
loading

Table of Contents