Yamaha FJR1300A(D) Service Manual page 131

Table of Contents

Advertisement

1. Ignition coil #1 coupler
2. Clutch hose
3. Front wheel sensor lead
4. Immobilizer unit lead
5. Main switch lead
6. Throttle cable (decelerator cable)
7. Throttle cable (accelerator cable)
8. Brake hose (brake pipe/upper joint assembly to
front brake calipers)
9. Brake hose (metering valve to right front brake
caliper)
10. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
11. ABS test coupler lead
12. Main fuse lead
13. Positive battery lead
14. Starter motor lead
15. Fuse box 1
16. Windshield drive system fuse
17. Cruise control system fuse
18. Brake light fuse
19. Fuse box 2
20. Hazard lighting fuse
21. Coolant temperature sensor coupler
22. Ignition coil #4 coupler
23. Ignition coil #3 coupler
24. Grip cancel switch coupler
25. Fuel injector #4 coupler
26. Fuel pump lead
27. Fuel sender lead
28. Fuel injector #3 coupler
29. Air induction system solenoid coupler
30. Intake air pressure sensor coupler
31. Fuel injector #2 coupler
32. Atmospheric pressure sensor coupler
33. Fuel injector #1 coupler
34. Throttle position sensor lead
35. Ignition coil #2 coupler
36. Sidestand switch lead
37. Oil level switch lead
38. Cylinder identification sensor lead
39. AC magneto lead
40. Main fuse coupler
41. ABS test coupler
A. Fasten the main switch lead, immobilizer unit lead,
and front wheel sensor lead to the wire harness
with a plastic locking tie, making sure to align the
tie with the white tape on the harness. Face the
end of the plastic locking tie forward. Do not cut off
the excess end of the plastic locking tie.
B. Position the plastic locking tie 0
in) from the end of the protective sleeve of the front
wheel sensor lead.
C. Position the plastic locking tie 10
1.18 in) from the end of the protective sleeve of the
immobilizer unit lead.
D. Route the throttle cables and brake hoses through
the right opening in the frame.
E. Install the immobilizer unit coupler holder so that
the end with the bolt is facing forward.
20 mm (0
0.79
30 mm (0.39
2-60
CABLE ROUTING
F. Install the positive battery lead terminal so that it is
not positioned to the outside of the starter relay.
G. Install the starter motor lead terminal so that it is
not positioned to the outside of the starter relay.
H. Install the fuse holders so that the hinged portions
of the holders are facing inward.
I.
Insert the projection on the wire harness holder
completely into the hole in the plate on the cylinder
head cover.
J. Insert the projection on the wire harness holder
completely into the hole in the plate on the throttle
body.
K. Insert the projection on the wire harness holder
completely into the hole in the plate on the fuel rail.
L. Route the fuel injector lead under the air induction
system hose.
M. Route the throttle position sensor lead under the
air induction system hose.
N. Route the ignition coil #2 lead over the air
induction system hoses.
O. Route the cylinder identification sensor lead over
the air induction system hoses.
P. Route the AC magneto lead under the oil level
switch lead and sidestand switch lead, and above
the wire harness.
Q. Install the main fuse coupler holder completely
onto the tab on the plate.
R. Install the ABS test coupler completely onto the
tab on the plate.
S. Pass the throttle cables through the guide.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents