10-FIRST START-UP
LOADING THE PELLETS
The pellets can be loaded either manually or automatically. The tank can contain up to 150 litres or 100 kg of pellets.
Manual Loading:
•
Open the top cover of the boiler and pour in the pellets.
Automatic loading (with remote tank of 100/200 or 400 kg - optional - see accessories):
•
Remove the round plate from the door, cut the insulation and insert the tank pipe. Next, load with the optional tank.
Never remove the protective grate from inside the tank. When loading pellets, keep the bag from coming into
contact with hot surfaces.
34