ANNuAL MAINTENANCE PROCEDuRES
The following section lists procedures that are necessary to maintain the Eclipse 5. Service should only be performed by a
qualified technician. To perform periodic maintenance, the only tools that should be necessary are:
•
#1 Phillips Screwdriver
•
Wire-cutting pliers
•
Small cable ties
•
ESD Mat or approved ESD system
REMOVING THE uNIT COVER
1.
Disconnect power supplies and remove Power Cartridge before removing the unit cover.
2.
Place the unit horizontally on the front cover.
3.
Using a Phillips #1 screwdriver, remove a total of 10 screws (M3x12 Pan Head SEM Screw,
P/N 6974-312-SEQ) from the back of the unit.
WARNING:
Personal Ambulatory Oxygen System Provider Technical Manual
Figure 11: Maintenance Tools.
Keep hands out of moving parts
•
Disconnect power supplies and remove Power Cartridge before
•
removing the unit cover.
•
ESD Safety procedure must be in place.
39
PN 20631679 Rev D