Rorke Data GX4L-2240S2-12S6 Installation And Hardware Reference Manual page 38

Galaxy hdx4 12 bay raid
Table of Contents

Advertisement

NOTE:
Screws for securing chassis to the front rack posts are provided in the
system's accessory box. There are 4 M5 x35mm, 4 M6 x35mm, and 4 #10-32
31.75mm screws.
Rackmount Rail Components
Installation Pre-requisites
One (1) medium-size and one (1) small-size cross-head
screwdrivers
One (1) medium-size flat-head screwdriver
Because the RAID system can weigh 17 kilograms without hard
disk drives, two (2) people are required to rack-mount the
enclosure.
CAUTION!
The hard drives and drive trays should only be installed into the
system after the system has been mounted into a rack cabinet. If
the hard drives are installed first, the system will be too heavy to
handle and the possible impact during installation may damage your
drives.
Rack-mounting Steps
Chapter 2: Hardware Installation
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gx4l-2240r2-12s6

Table of Contents