No.
Part name
PMV motor
11
Procedure
1. Detachment
1) Carry out work of 1.Detachment of
2) Remove the relay connector of PMV motor.
3) Peel the butyl rubber adhered to the main
unit of the pulse motor valve (PMV) until
PMV can be seen and then loosen the nuts
fixing PMV motor with double spanner to
remove PMV motor.
2. Attachment
1) Mount PMV motor and relay connector as
before.
NOTE :
Control the tightening torque for the PMV body
and PMV motor to 5.8 ± 0.7ft . lbs(7.84 ± 0.98Nm).
.
10
114
Remarks
PMV body
PMV motor