Use Of The Machine; Preparation Of The Machine - ECM Technika IV Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

9
Wait until the boiler pressure gauge indicates approx. 1.0-1.25 bar.
10 A manual "boiler ventilation" is not necessary because the MECHANIKA /TECHNIKA is equipped with a
professional depression valve that ventilates the boiler during the heating-up phase.
11 Move the group lever into the upper position and dispense approx. 250 ml of water. This way, the heat exchanger
will be filled with water and the circulation of the water in the thermosyphon system begins.
12 Move the group lever into the lower position. Refill the water tank.
13 The machine is now ready for use. Put the cups on the cup heater tray in order to preheat them and enjoy your
coffee.
Machine in use with direct water connection
1
Insert the plug into the wall socket. Turn the power switch to "1". The machine is now on.
2
The green control lamp lights up.
3
The pump begins to fill the boiler of the machine with fresh water.
4
As soon as boiler has filled, no more pump noise will be heard; the orange control lamp is on now.
5
Wait until the boiler pressure gauge indicates approx. 1.0-1.25 bar.
6
A manual "boiler ventilation" is not necessary because the MECHANIKA /TECHNIKA is equipped with a
professional depression valve that ventilates the boiler during the heating-up phase.
7
Move the group lever into the upper position and dispense approx. 250 ml of water. This way, the heat exchanger
will be filled with water and the circulation of the water in the thermosyphon system begins.
8
Move the group lever into the lower position.
9
The machine is now ready for use. Put the cups on the cup heater tray in order to preheat them and enjoy your
coffee.
The MECHANIKA/TECHNIKA has a fuse to prevent the machine from overfilling.
It is possible that the machine does not heat up when using it for the first time or when dispensing
large quantities of water through the hot water valve. In this case please switch the machine off and
on again.
6

USE OF THE MACHINE

6.1 Preparation of the machine

The switched off machine is to be placed into operation as follows:
Water tank machine or machine in use with water tank
1
Fill water into the water tank.
2
Make sure that there is enough water in the water tank.
3
Turn the machine on (power switch in position "1").
4
Wait until the pressure gauge indicates approx. 1.0-1.25 bar.
5
Depending on the ambient temperature, the heat-up phase is approx. 15 minutes.
6
The machine is now ready for use.
7
Insert the filter holder and move the brew group lever into the upper position. Release some hot water. Thus, the
filter holder will be completely heated.
Machine in use with direct water connection
1
Make sure that there is enough pressure in the direct water supply connection.
2
Turn the machine on (power switch in position "1").
3
Wait until the pressure gauge indicates approx. 1.0-1.25 bar.
4
Depending on the ambient temperature, the heat-up phase is approx. 15 minutes.
5
The machine is now ready for use.
6
Insert the filter holder and move the brew group lever into the upper position. Release some hot water. Thus, the
filter holder will be completely heated.
It is recommended to leave the filter holder in the brew group keeping it warm for optimum
temperature for coffee dispension.
Instruction manual MECHANIKA · TECHNIKA
26
ENGLISH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mechanika iv

Table of Contents