Assembly Procedure (Large Size: 15Kg • 30Kg); Base Replacement - KERN GAB 3K1DM Service Manual

Hide thumbs Also See for GAB 3K1DM:
Table of Contents

Advertisement

4.2 Assembly Procedure (Large Size: 15kg • 30kg)

4.2.1 Base Replacement

The seal restricts the peel according to the country by a no report and doing as wanting
put it.
Do the procedure in a pertinent country.
Disassembly procedure
1. Remove two dry batteries when using the batteries. Remove the AC adaptor when using the
AC adaptor.
2. Remove the four foot levels.
3. Peel off the approval seal.
4. Remove the four M4×10 screws.
5. Lift the base, and pull out the battery harness from CN2 of the main board PS-005.
Assembly procedure
1. Do in the reverse order for assembly.
2. The material of approval seal is void seal. It is not possible to use it again. Put a new approval
seal.
KERN
- 25 - GAB/GAS-SH-e-0711