Finish the installation by completely tightening the screws in the same sequence.
b.
Install the air baffle.
7.
Install the access panel.
8.
Do one of the following:
9.
Slide the server into the rack.
o
Install the server into the rack.
o
Connect each power cord to the server.
10.
Connect each power cord to the power source.
11.
Press the Power On/Standby button.
12.
The server exits standby mode and applies full power to the system. The system power LED
changes from amber to green.

Expansion board

To remove the component:
Power down the server (on page 30).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Do one of the following:
3.
Extend the server from the rack (on page 30).
o
Remove the server from the rack (on page 33).
o
Remove the access panel
4.
Disconnect all cables connected to existing expansion boards.
5.
Remove the PCI riser cage (on page 35).
6.
Remove the expansion board.
7.
("Access
panel" on page 40).
Removal and replacement procedures 61