Front I/O Module - HP HPE ProLiant DL120 Gen9 Maintenance And Service Manual

Hide thumbs Also See for HPE ProLiant DL120 Gen9:
Table of Contents

Advertisement

Do one of the following:
4.
Slide the server into the rack.
o
Install the server into the rack.
o
Power up the server.
5.
For more information about battery replacement or proper disposal, contact an authorized reseller or an
authorized service provider.

Front I/O module

To remove the component:
If installed, remove the security bezel
1.
Power down the server (on page 30).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Do one of the following:
4.
Extend the server from the rack (on page 30).
o
Remove the server from the rack (on page 33).
o
Remove the access panel
5.
Remove the front I/O module.
6.
Disconnect the front I/O module from the system board.
a.
Detach the ambient thermal sensor cable from its clip.
b.
Remove the screws and disconnect the front I/O module connectors from the front panel.
c.
Four-bay LFF drive model
("Remove the security bezel
("Access
panel" on page 40).
(optional)" on page 29).
Removal and replacement procedures 69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl120 gen9

Table of Contents