IDEAL Project Heat 15 Installation And Servicing page 4

Table of Contents

Advertisement

Table 1 - general Data
project heat
Gas supply
Gas Supply Connection
Injector Size
Flow Connection
Return Connection
Flue Terminal Diameter - Turret
Flue Terminal Diameter - Rear Flue Outlet (55/80)
Average Flue Temp-Mass Flow Rate
Max. static water head
Min. static water head
Max. Working Pressure (Sealed Systems)
Electrical Supply
Power Consumption
Fuse Rating
Water content
Packaged Weight
Maximum Installation Weight
Boiler Casing Size
Table 2 - performance Data - Central heating
Boiler Input :
Boiler Input 'Q'
Nett CV
Gross CV
Gas Consumption
Boiler Output :
Non Condensing
70
C Mean Water temp.
o
Condensing
40
C Mean Water temp.
o
Seasonal efficiency* (SEDBUK) 2005
Seasonal efficiency* (SEDBUK) 2009
NOx Classification
* The value is used in the UK Government's Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from
which it has been calculated have been certified by a notified body.
Note. Gas consumption is calculated using a
calorific value of 38.7 MJ/m
or 34.9 MJ/m
(935 Btu/ft
) nett
3
3
To obtain the gas consumption at a different
calorific value:
a. For l/s
- divide the gross heat input
(kW) by the gross C.V. of the gas (MJ/m
b. For ft
/h - divide the gross heat input (Btu/h)
3
by the gross C.V. of the gas (Btu/ft
c. For m
/h - multiply l/s by 3.6
3
4
Central Heating
Central Heating
bar (lb/in
litre (gal)
Height mm (in)
Width mm (in)
Depth mm (in)
15
MIN
MAX
kW
4.9
15.1
(Btu/h)
(16,600)
(51,520) (16,600) (82,900)
kW
5.4
16.6
(Btu/h)
(18,400)
(56,800) (18,400) (92,000)
m
/h
0.500
1.537
3
(ft
/h)
(17.8)
(54.7)
3
kW
4.8
15.0
(Btu/h)
(16,500)
(51,300) (16,500) (82,600)
kW
5.1
15.9
(Btu/h)
(17,500)
(54,250) (17,500) (87,400)
91.1%
89.3%
CLASS 5
(1038 Btu/ft
) gross
3
3
)
3
)
3
general
15
(mm)
4.15
mm (in)
mm (in)
56ºC - 6g/s
m (ft.)
m (ft.)
)
2
W
26
External : 3A
kg (lb)
28.7 (63.3)
kg (lb)
23 (51)
24
MIN
MAX
4.9
24.3
5.4
27.0
0.500
2.512
(17.8)
(89)
4.8
24.2
5.1
25.6
91%
89.5%
Key to symbols
gB =
United Kingdom
pMs = Maximum operating pressure of water
C
C
C
= A room sealed appliance designed for connection via ducts to a
13
33
53
horizontal or vertical terminal, which admits fresh air to the burner
and discharges the products of combustion to the outside through
orifices which, in this case, are concentric. The fan is up stream of
the combustion chamber.
I
= An appliance designed for use on 2nd Family gas, Group H only.
2h
2H - G20 - 20mbar
15mm copper compression
22mm copper compression
22mm copper compression
100 (4)
80 (3)
63ºC - 10g/s
30.5 (100)
0.45 (1.5)
2.5 (36.3)
230 V ~ 50 Hz.
Internal : T4H HRC L250 V
1.2 (0.26)
700 (27.5)
395 (15.5)
278 (11)
IE = Ireland
(Countries of destination)
Project Heat -
Installation and Servicing
24
4.15
46
28.7 (63.3)
23 (51)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents