IDEAL Project Heat 15 Installation And Servicing page 25

Table of Contents

Advertisement

27 MOuNTINg THE BOILER - REAR FLuE OuTLET KIT (55/80)
1. Remove the rear flue blanking disk.
2. Lift the boiler onto the wall plate, (refer to the
introduction section for safe handling advice),
ensuring the boiler is offered to the bracket tabs at
an angle as shown below, and carefully allow the
boiler to swing down to the wall as this movement
engages the rear flue air and flue seal.
3. Screw the boiler bottom retaining bracket to the
wall with the screw provided.
4. Remove the top flue blanking disk refer to
Frame 26. Fill the condensate trap within the
boiler by pouring a cupful of water into the flue
outlet. Take care to ensure that the water is only
poured into the flue outlet, and does not spill into
the boiler casing.
5. Replace the top flue blanking disc and retain with
the horseshoe bracket and fixing screw previously
removed.
During assembly check that the flue seals do not
become dislodged.
Project Heat -
Installation and Servicing
INSTALLATION
3
1
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents