Steps For Installing The Battery Box And Learn Switch; Battery Installation - Travis Industries 36 CF ST/Pier Installation Manual

Gas fireplace
Hide thumbs Also See for 36 CF ST/Pier:
Table of Contents

Advertisement

16

Steps for Installing the Battery Box and Learn Switch

1. Remove the control cover and attach the 12' long battery box wire to the quick connects on the
receiver module (see Figure 9 below). Route the battery box wire through the opening below
the cover.
At this time make sure the continuous pilot switch is set to "OFF" and the remote
switch is set to "REMOTE" on the receiver module – item "a"). You may also wish to verify all
the wire leads are fully attached.
Battery Box
(external junction box)
Battery Wires
Red and White Wires
Gas Control Valve
Pilot Flame Control Wires
2. Determine a location for the single-gang junction box that contains the battery pack and learn
switch. It must be located within 12' of the fireplace. Mount the junction box.
3. Insert the battery box wires through the junction box, leaving approximately 8" of slack so the
battery pack may be removed and the batteries replaced. Use a staple or other means to
secure the wiring to the framing – this prevents the wires from slipping out of the junction box in
the event the wires become disconnected from the battery pack (see Figure 8). NOTE: The
wiring is low-voltage (6V) and does not require a strain relief. Connect the learn switch and
battery pack wires (see Figure 9).
4. Place batteries inside the battery pack and place it inside the junction box. Attach the remote
holder to the junction box with the included screws.
INSTALLATION WARNING – Remote Synchronization
At this time we highly recommend you verify the remote and fireplace are synchronized. This
process requires access to the learn switch. See the instructions on page 17 for details.

Battery Installation

This fireplace uses four AA batteries for operation during power outages. Place the batteries into
the battery box. In addition, two AAA batteries are required for the transmitter.
© Travis Industries
Installation
Learn Wires
Two White Wires
Motor Wires (for flame height adjustment)
Red, Yellow, White, and Blue wires
AC Adapter
(wire orientation does not matter)
Brown Switch
Wires (not
used)
Main Burner Control Wires
White
Green
Orange
White
(for qualified installers only)
Pilot Assembly
Igniter ("I") Wire
(Orange - with
fiberglass
Receiver
insulation)
Module
Sensor ("S")
Wire (White)
Make sure continuous pilot
a
is set to "OFF" and remote
Black
is set to "REMOTE".
Ground
Accent Light Wires
Orange and White Wires
Power Input
120V Extension Module
4090102
Auxiliary Power
(Not Used)
Make sure continuous pilot
is set to "OFF" and remote
is set to "REMOTE".
Figure 9
100-01212_000

Advertisement

Table of Contents
loading

Table of Contents