Deck Installation - Model Mw - Walker MT Detailed Instructions

Hide thumbs Also See for MT:
Table of Contents

Advertisement

Spring Tension Adjustment Nut
Located Under Lower
Spring Hook (not visible)
Hitch Pins
Lock Deck On
Support Arms
Deck Counterweight Spring Installation
5.
Raise mower body (instead of lifting the front of
deck) and clip the counterweight springs to the re-
ceptacle on front of body. Lower the body to ten-
sion the springs. (Refer to Deck Counterweight
Spring Installation photo.)
6.
With the counterweight springs connected, the
weight on the deck caster wheels should be 15 to
25 Ib (6.8 to 11.3 kg). Check this weight by lifting
on the front of the deck carrier frame. If required,
the spring tension can be adjusted by tightening or
loosening the elastic stop nuts located underneath
the lower spring hook. Refer to Deck Counter-
weight Spring Installation photo.
SERVICE INSTRUCTIONS
Counterweight Springs
Clip Onto Body
With Body Tilted Up
WALKER MANUFACTURING COMPANY
July 2006

Deck Installation - Model MW

1.
Lightly grease each deck support arm (2) on the
tractor. Refer to Mower Deck Installation photo
for location of deck support arm.
2.
Engage the deck carrier frame tube sockets on the
tractor support arms. Slide the deck onto the sup-
port arms.
NOTE: When installing the DSD52 Mower deck,
make sure to retract the dolly wheel after mounting
the deck on the tractor.
3.
Install the hitch pin through the hole on the end of
each support arm to lock the deck in place (refer to
Counterweight Spring Receptacle Assembly
photos). Two (2) hitch pins are included in the own-
er's packet of materials.
4.
Connect the mower deck PTO drive shaft assem-
bly to the tractor with the splined quick disconnect
coupler. This coupler simplifies shaft alignment
and installation.
a.
Use the arrows on the shaft and tube to align
and slide the PTO quick coupler onto the deck
splined shaft.
b.
Reaching under the tractor, pull the ring back
on the coupler, slide onto the spline shaft on
the tractor, and release the ring.
IMPORTANT: To prevent damage to the mower,
make sure the PTO shaft assembly is securely
locked on the tractor, with the locking balls fully
seated in the groove and the ring in the full forward
position (refer to the Coupler Ring "Locked" Po-
sition photo). After installation, pull on the shaft to
check for security.
Mower Deck Installation
(PTO Shaft Connection)
Page: 1-11
Grease Deck
Support Arms
PTO
Shaft

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

MtlMcMsMw15MtefiMb ... Show all

Table of Contents