HP 5130 EI Switch Series Installation Manual page 69

Hide thumbs Also See for 5130 EI Switch Series:
Table of Contents

Advertisement

installation site dust concentration,
installation site gas saturation,
installation site humidity,
installation site temperature,
laser safety recommendations,
recommendations,
setting
IRF fabric,
24
switch configuration environment,
terminal parameters,
SFP+
port,
48
port LED,
55
site
cleanliness,
3
dust concentration,
examining installation site,
gas saturation,
3
humidity,
3
IRF fabric installation site planning,
temperature,
3
stop bits (parameter),
switch
attaching mounting bracket to switch chassis,
chassis views,
34
connecting console cable,
connecting IRF physical ports,
cooling system,
57
first time access,
21
FRUs,
44
grounding,
1 1
grounding through AC power supply PE wire,
grounding with grounding conductor buried in
the earth ground,
grounding with grounding strip,
identifying IRF master switch,
identifying IRF member switch physical ports,
installation,
6
LEDs,
45
maintaining,
31
maintaining the switch,
planning IRF cabling scheme, 27,
planning IRF member IDs,
ports,
45
powering on,
22
3
3
3
3
4
2
21
22
3
2
25
22
21
29
13
1 1
25
31
27
25
rack-mounting,
setting configuration environment,
setting terminal parameters,
setting up IRF fabric,
technical specifications,
troubleshooting,
troubleshooting the switch,
verifying 19-inch rack installation,
workbench mounting switch,
system administration
troubleshooting configuration terminal problems,
33
troubleshooting fixed power supply failure,
troubleshooting hot-swappable power supply
failure,
32
troubleshooting power supply failure,
system status LED,
T
technical specifications,
10/100/1000 Base-T Ethernet port,
10/100/1000 Base-T Ethernet port LED,
100/1000Base-X SFP LED,
100/1000Base-X SFP port,
7
combo interface,
console port,
LED,
49
port,
45
port mode LED,
power supply status LED,
RPS status LED,
SFP+ port,
13
SFP+ port LED,
system status LED,
temperature
installation site requirements,
terminal
27
troubleshooting garbled terminal display,
troubleshooting no terminal display,
tools needed for installation,
topology
planning IRF cabling scheme, 27,
topology (IRF fabric),
troubleshooting
configuration terminal problems,
65
9
22
24
34
31
31
10
49
40
54
46
49
45
50
50
50
48
55
49
3
4
26
33
21
19
31
31
45
51
33
33
27

Advertisement

Table of Contents
loading

Table of Contents