Mounting The Switch On A Workbench - HP 5130 EI Switch Series Installation Manual

Hide thumbs Also See for 5130 EI Switch Series:
Table of Contents

Advertisement

Figure 10 Mounting an HP 5130-24G-SFP-4SFP+ EI switch by the rear mounting position
Figure 11 Mounting an HP 5130-24G-SFP-4SFP+ EI switch by the mid-mounting position

Mounting the switch on a workbench

IMPORTANT:
Ensure 10 cm (3.9 in) of clearance around the chassis for heat dissipation.
Do not place heavy objects on the switch.
If a standard 19-inch rack is not available, you can place you switch on a workbench.
To mount the switch on a workbench:
1.
Verify that the workbench is sturdy and reliably grounded.
2.
Place the switch with bottom up, and clean the round holes in the chassis bottom with dry cloth.
3.
Attach the rubber feet to the four round holes in the chassis bottom.
4.
Place the switch with upside up on the workbench.
10

Advertisement

Table of Contents
loading

Table of Contents