Installing The Cover - IBM eServer 200VL xSeries Installation Manual

Hide thumbs Also See for eServer 200VL xSeries:
Table of Contents

Advertisement

Complete the following steps to install a U-bolt.
1. Turn off the server and peripheral devices and disconnect all external cables and
2. Use a screwdriver to remove the two metal knockouts.
3. Insert the U-bolt through the rear panel; then, attach and tighten the nuts.
4. If you have other options to install or remove, do so now.
5. Reinstall the side cover. See "Installing the cover" for details.
6. Thread the cable through the U-bolt and around an object that is a part of or
7. Reconnect the external cables and power cords; then, turn on the peripheral

Installing the cover

The following information describes the cover installation procedure.
Notes:
1. The illustrations in this document might differ slightly from your hardware.
2. If you removed the support-bracket assembly after you removed the cover,
22
IBM xSeries 200 and xSeries 200VL: Installation Guide
— A lock, such as a combination lock or padlock
Read "Safety" on page v and "Handling static-sensitive devices" on page 3.
power cords; then, remove the cover (see "Removing the side cover" on page 9
for details).
permanently secured to the building structure or foundation, and from which it
cannot be removed; then, fasten the cable ends together with a lock.
devices and the server.
reinstall it before you install the cover. See "Removing the support-bracket
assembly" on page 10 for details.