Camus Hydronics DRH300 Installation, Operation And Service Manual page 41

Gas fired commercial condensing stainless steel tube boilers
Table of Contents

Advertisement

Slave Boiler
Description
Slave boiler lead lag setup
Electrical Connection(s)
Programming Instructions
1) Place both toggle switches to LOCAL
2) Press
and
3) Select System Identification & Access
4) Verify Modbus address. To be in sequential order
5) Select Lead Lag Slave Configuration
6) Select Slave Enabled = Enable slave for built-in Lead Lag master
The following steps are performed at the factory and verifying on site will
be sufficient:
7) Select Pump Configuration
8) Press [Advanced Options >>]
9) Press the
to arrive at Central Heat Pump or DHW Pump
10) On Options:
Local burner demand
11) On Options: Local Lead Lag
12) Force On:
Outlet high limit
Service Active
35