Camus Hydronics DRH300 Installation, Operation And Service Manual page 39

Gas fired commercial condensing stainless steel tube boilers
Table of Contents

Advertisement

DR(H,W) Lead lag Operation
Master Boiler
Description
Master boiler lead lag setup
Electrical Connection(s)
Programming Instructions
1) Place both toggle switches to LOCAL
2) Press
and
3) Select System Identification & Access
4) Verify MB1 Modbus address = 1
5) Verify MB2 Modbus address = 1
6) Select Lead Lag Master Configuration
7) Select Master Enabled = Enabled
Fixed Setpoint operation
8) Enter CH Setpoint (Fixed setpoint)
4-20mA/ 0-10Vdc setpoint operation
9) Select [Advanced Settings >]
to arrive at Central Heat
10) Press the
11) Select Setpoint Source = S2 (J8-6) 4-20mA
12) Select 4mA water temperature
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents