Connecting Relay 1 And Relay 2 - SMA SUNNY ISLAND 3.0M Installation Manual

Hide thumbs Also See for SUNNY ISLAND 3.0M:
Table of Contents

Advertisement

SMA Solar Technology AG
7. Open the cable feed-through plate and insert the cable support
sleeves into the cable feed-through plate. Position the flat sides of
each cable support sleeve on the flat side in the cable
feed-through plate.
8. Hold the cables and push the cable feed-through plate to the
enclosure opening of the cable feed-through plate.
9. Hook the cable feed-through plate into the enclosure opening of the cable feed-through plate and press into the
enclosure opening.
7.5.5

Connecting Relay 1 and Relay 2

If you are using a multifunction relay, always connect it as follows:
Switching behavior of the slaves
In case of a fault, the multifunction relays of the slaves switch less reliably than the multifunction relays of the masters.
In case of a fault, the slaves wait for the master to confirm the fault.
Additionally required material (not included in the scope of delivery):
☐ Suitable bootlace ferrules if using stranded wire
Requirement:
☐ The technical requirements of the multifunction relay must be met (see Section 10 "Technical Data", page 101).
☐ Copper wire
☐ Conductor cross-section: 0.2 mm² to 2.5 mm²
Procedure:
1. Break through a suitable location in the cable feed-through plate with a sharp object.
2. Strip off the insulation from the cable and press bootlace ferrules onto the insulated conductors.
3. Lead the cable through the hole in the cable feed-through plate into the Sunny Island.
Installation manual
SI30M-44M-60H-80H-IA-en-32
7 Electrical Connection
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 6.0hSunny island 4.4mSunny island 8.0h

Table of Contents