Firebox Installation; Framing Drawing - Realfires RF1200TW Installation Manual

Table of Contents

Advertisement

Firebox installation:

Framing Drawing

250mm stainless steel inner
300mm galvanised outer flue
Note - the Y-piece does not
have to be used and the flue
can be finished using two
200/250 flue
200mm stainless steel inner
250mm galvanised outer flue
While the Y-Piece can be fitted
directly onto the firebox, it is
recommended that 1200mm of
flue is fitted before the Y-piece
Suitable gas supply required to
provide at least 67MJ/h. At least
310mm of supply pipe is required
to reach gas control
Min 1 Amp electrical
supply required.
Fire supplied with 1.8m
power cord with 3 pin plug
10 Min
25
mm
Min
10
Min
~ 310
Fire is viewed from the open side with the glass to the rear. It must be
confirmed which way the fire is to be viewed prior to installation as the
glass can not be reversed.
8
700
1340
Min
25
mm
Min
10
Min