Digisol DG-GS4526P Installation Manual page 18

22 port 10/100/1000mbps layer 2 poe switch with 4 gc ports
Table of Contents

Advertisement

DG-GS4526P Installation Guide
1. Insert one end of the power cable provided in the accessory kit into the power source
socket (with overload and leakage protection), and the other end to the power socket in
the back panel of the switch.
2. Check the power status indicator in the front panel of the switch. The corresponding
power indicator should light. DG-GS4526P are self-adjustable for the input voltage. As
soon as the input voltage is in the range printed on the switch surface, the switch can
operate correctly.
3. When the switch is powered on, it executes self-test procedure and startups.
Caution!
The input voltage must be within the required range, otherwise the switch can be
damaged or malfunction. Do not open the switch shell without permission. It can cause
physical injury.
18

Advertisement

Table of Contents
loading

Table of Contents