Digisol DG-GS4526P Installation Manual page 11

22 port 10/100/1000mbps layer 2 poe switch with 4 gc ports
Table of Contents

Advertisement

Caution!
A sample of ambient temperature and humidity should be taken at 1.5m above the
floor and 0.4m in front of the switch rack, with no protective panel covering the front and
rear of the rack. Short term working conditions refer to a maximum of 48 hours of
continued operation and an annual cumulative total of less than 15 days. Formidable
operation conditions refers to the ambient temperature and relative humidity value that
may occur during an air-conditioning system failure, and normal operation conditions
should be recovered within 5 hours.
2.1.1.3 Power Supply
It is adopted module switch power for the switch, the input parameter of power is
shown below:
The AC input voltage: 100~240VAC
The frequency: 50~60Hz
Before powering on the power supply, please check the power input to ensure proper
grounding of the power supply system. The input source for the switch should be reliable
and secure; a voltage adaptor can be used if necessary. The building's circuit protection
system should include in the circuit a fuse or circuit-breaker of no greater than 240 V, 10 A.
It is recommended to use a UPS for more reliable power supplying. .
Caution!
Improper power supply system grounding, extreme fluctuation of the input source,
and transients (or spikes) can result in larger error rate, or even hardware damage!
2.1.1.4 Preventing Electrostatic Discharge Damage
Static electric discharges can cause damage to internal circuits, even the entire
switch. Follow these guidelines for avoiding ESD damage:
Ensure proper earth grounding of the device;
Perform regular cleaning to reduce dust;
Maintain proper temperature and humidity;
Always wear an ESD wrist strap and antistatic uniform when in contact with circuit
boards.
DG-GS4526P Installation Guide