Tools And Auxiliary Materials; Recommended Wall Clearances - Buderus Logano GE615 Installation And Maintenance Instructions Manual

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

4
Installation
4.2

Tools and auxiliary materials

The following tools and auxiliary materials are required for
the boiler assembly (the listed items are not contained in
the scope of supply).
– Boiler compression tool 2.3
– Installation kit (accessory)
– Steel hammer and wooden or rubber mallet
– Half-round smoothing file
– Screwdriver (Philips and slotted head)
– Flat chisel, support wedge, flat iron
– Spanner size 13, 19, 24, 36 and size 19 Allen key
– Cleaning rags and cloth
– Fine emery cloth
– Wire brush
– 3-in-1oil
– Solvent (petrol or solution)
– Spirit level, ruler, chalk, straight edge
Sections
Compression
tool(s) per
boiler hub
9 – 16
1
Tab. 7 Boiler compression tool size 2.3 (complete in
the toolbox)
4.3

Recommended wall clearances

Observe the recommended wall clearances for easier
boiler installation, cleaning and maintenance. Adhere to
the minimum clearances (in brackets) in all cases.
Take into account the space required for opening the
burner door.
The burner door can be hung on the right or left.
The wall clearance on the hinge side must be at least the
same as the amount by which the burner projects (AB).
Recommended wall clearance AB + 100 mm.
If you do not observe the recommended minimum wall
clearances, you will not be able to use the cleaning set
(accessory) to clean the boiler. You could, however, use
shorter (approx. 1 m) cleaning devices or perform wet
cleaning.
Boiler rating
kW
Sections
570 – 820
9 – 12
920 –
13 – 16
1200
Tab. 8 Recommended and minimum wall clearances
10
Extension(s)
Length
per boiler
(total)
hub
mm
3
3080
Clearance A (mm)
re-
at least
commended
2300
1400
3000
1500
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Fig 3
Boiler compression tool size 2.3 (dimensions in
mm)
1
Mating flange
2
Additional flange
3
Compression unit
4
Pull rod
5
Extension
6
Wedge (size 2.3)
Fig 4
Boiler room with boiler (dimensions in mm)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents