Buderus Logano GE615 Installation And Maintenance Instructions Manual page 55

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

As-required maintenance work
1.
Shutting down the heating system
2.
Remove and clean the hot gas baffles
3.
Clean the hot gas flues (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the flue gas header
6.
Insert the hot gas baffles
7.
Check gaskets/packing cords on the burner and burner
door and replace if required
8.
Start up the heating system
9.
Record the final checks of the maintenance work, incl.
measurements and test results
10.
Check functioning and safety in operation
Confirm the professional inspection
Tab. 17 Maintenance report
Date:_____
Date:_____
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company
stamp/
signature
Tab. 18 Continuation
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Date:_____
Company
Company
stamp/
stamp/
signature
signature
Heating system inspection and maintenance
Page
Date:______
44
47
48
48
48
25ff.
48
41
Company
stamp/
signature
Date:_____
Date:_____
Company
Company
stamp/
stamp/
signature
signature
Date:______
Date:______
Company
Company
stamp/
stamp/
signature
signature
Date:_____
Date:_____
Company
Company
stamp/
stamp/
signature
signature
7
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents