Setting Up The Boiler Block - (When Supplied As A Pre-Assembled Block) - Buderus Logano GE615 Installation And Maintenance Instructions Manual

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

4.5
Setting up the boiler block – (when
supplied as a pre-assembled block)
z Cut through the straps.
z Remove pallet.
Warning: Danger to life
from falling loads.
z Observe the transport information on the
data sheet (attached to boiler block) when
lifting the boiler block off the pallet.
Level the boiler block vertically and horizontally on the
base/silencing plinth. Use the boiler section foot wedges
provided for this purpose.
Once the boiler block is levelled, remove the transport
stay from the upper and lower hubs.
The following pages describe the installation
of the feed pipe, sensor well and outer steam
tube. The installation steps are the same,
regardless of whether delivery is as a pre-
assembled block or in loose sections.
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Fig 19 Boiler block on pallet
1
Securing straps
2
Pallet
Fig 20 Removing transport stay
1
Upper hub
2
Lower hub
3
Transport stay
4
Installation
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents