Regulations; Boiler Room; Quality Of Heating Water; Disposal And Recycling - Buderus Logano GE615 Installation And Maintenance Instructions Manual

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

3

Regulations

3
Regulations
Observe all standards and guidelines
applicable to the installation and operation of
this heating system in your country.
The information on the rating plate has
precedence and MUST be observed.
3.1

Boiler room

Caution: System damage
caused by frost.
z Set up the heating system in a room safe
from the risk of frost.
3.2

Quality of heating water

V For correct use and treatment of the fill and top-up
water, you MUST observe observe the operator's log,
which is included with the technical documentation.
z Enter the amount and quality of the fill water in the log.
Total boiler output Q
kW
100 d Q d 350
350 d Q d 1000
100 d Q d 350
350 d Q d 1000
Q > 1000
Tab. 4 Requirements for fill, top-up and heating water
3.3

Disposal and recycling

z If any heating system components need to be replaced,
they should be disposed of in an environmentally
responsible manner, via an approved disposal site.
z Dispose of packaging in an environmentally
responsible manner.
8
Ca(HCO
)
concentration
3
2
of the fill and top-up water
mol/ m³
d 2,0
d 1,5
> 2,0
> 1,5
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Maximum fill and top-up water
volume V
max
V
= three times system volume
max
V
= 0.0313 x Q / Ca(HCO
max
with: Q in kW and Ca(HCO
mol/ m³
Heating water
pH value
8,2 – 9,5
)
3
2
)
in
3
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents