z Insert the flexible packing cord on the front of the rear
section, starting around the upper hub, into the packing
grooves, and press in lightly.
z At the butt joints, overlap the packing cord by approx.
2 cm and press firmly together.
Unroll the required length of packing cord
(KM cord) from the roll supplied. Peel the
backing paper from the packing cord when
inserting into the packing groove (do not
stretch).
V Do not allow the packing cord to overlap on the left- or
right-hand joints (Æ Fig. 12, 3).
Prepare the first central section (with upper flow
connection):
z File down any burrs on the hub.
z The packing springs must be clean and dry. Clean if
necessary.
Caution: Risk to health
through vapours released during the
processing of materials, such as adhesives,
adhesive bases or red lead putty.
z Observe processing and safety
instructions on the material packaging.
z Ensure good ventilation in the installation
area.
V Wear work gloves to avoid skin contact.
z The product and its container must be
treated as hazardous waste for disposal
purposes.
z Clean the hub sealing faces with a rag soaked in white
spirit.
z Coat the hub sealing faces with red lead putty.
z Coat the packing springs with adhesive (adhesive
base)
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Fig 12 Inserting packing cord (KM cord)
1
Packing grooves
2
Packing cords
3
Joints
Fig 13 Preparing the central section
1
Hub sealing face
2
Sealing springs
4