Buderus Logano GE615 Installation And Maintenance Instructions Manual page 18

Calorific value forced draft sectional boiler
Hide thumbs Also See for Logano GE615:
Table of Contents

Advertisement

4
Installation
Fig. 17 shows the central section with flow connection.
The nipples for fitting the next central section are inserted
into the corresponding hubs. The packing cord has
already been inserted into the packing groove. As with the
rear section (Æ Fig. 12, page 15), there is also a break in
the elastic packing cord here. The boiler section has been
equipped with foot wedges for ease of installation. The
boiler section foot wedges are also used later for final lev-
elling of the boiler block.
Assemble all other boiler sections as described. The front
section is fitted last.
After the front section is attached, loosen the
compression tool but do not remove it. Insert
the anchor rods first.
Caution: System damage
through excessively low contact pressure.
z Do not compress the spring pack. Only
use the spring pack in its original state.
z Insert the anchor rods (with spring packs fitted) into the
cast lugs on the top left and right and bottom left and
right, next to the boiler block hubs.
z Put a nut onto each of the threaded anchor rods and
tighten by hand.
z Now tighten the nuts on the anchor rods 1 to 1½
turns.
V Level the boiler block vertically and horizontally on the
base/silencing plinth (Æ see section 4.3.1, page 11).
Use the boiler section foot wedges provided for this
purpose. (Fig. 17, page 18).
z Remove boiler compression tool.
The next step describes the installation of the feed pipe
(Æ see section 4.6, page 20).
18
Fig 17 Using the boiler section foot wedges
1
2
Fig 18 Inserting the anchor rods
1
2
3
Logano GE615 - We reserve the right to make any changes due to technical modifications.
Packing cord (with break)
Boiler section foot wedge
Anchor rods (bottom)
Anchor rods (top)
Anchor rod with spring pack

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents