IDEAL Logic HEAT 12 Installation And Servicing page 50

Hide thumbs Also See for Logic HEAT 12:
Table of Contents

Advertisement

65 BOILER sEaLINg paNEL sEaL REpLaCEMENT
1. Refer to Frame 51.
2. Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3. Fit the new seal, ensuring the bottom joint
provides an air tight seal.
5. Reassemble in reverse order.
6. Check operation of the boiler. Refer to
Frames 40 & 41.
Note. Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
50
SERVICING
Ideal Logic Heat -
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents