BOILER DIMENsIONs, sERVICEs & CLEaRaNCEs
The boiler connections are made on the boiler connection tails.
Refer to Frame 34.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
2.5
Condensate Connection and Gas Connection
10
2.5
from case
Side flue
dim. A
165
108
122
Gas Inlet
Condenste Drain
general
wall thicknesses do not exceed 600mm (24"). Where the
space into which the boiler is going to be installed is less
than the length of flue required the flue must be fitted from
the outside.
Installation from inside ONLy
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
395
43.5
308
50
CH
CH
RTN
Flow
700
Ideal Logic Heat -
all dimensions in mm
52
76
Front clearance
The minimum front clearance when built in to a
cupboard is 5mm from the cupboard door but
450mm overall clearance is still required, with
the cupboard door open, to allow for servicing.
*
Bottom clearance
Bottom clearance after installation can be
reduced to 5mm.
This must be obtained with an easily
removable panel, to enable the consumer
to view the system pressure gauge, and to
provide the 100mm clearance required for
servicing.
Installation and Servicing
Flue
Terminal
(60/100)
Alternative
Rear
Flue
Outlet
(55/80)