Electrical Supply; Air Supply; Water Circulation System - IDEAL Logic HEAT 12 Installation And Servicing

Hide thumbs Also See for Logic HEAT 12:
Table of Contents

Advertisement

TERMINaL
The terminal assembly can be adapted to accommodate various
wall thicknesses. Refer to Frame 1 .

aIR sUppLy

It is NOT necessary to have a purpose-provided air vent in the
room or internal space in which the boiler is installed. Neither
is it necessary to ventilate a cupboard or compartment in which
the boiler is installed, due to the low surface temperatures of the
boiler casing during operation; therefore the requirements of BS
6798, Clause 12, and BS 5440:2 may be disregarded.

WaTER CIRCULaTION sysTEM

IMpORTaNT.
A minimum length of 1 metre of copper pipe MUST be fitted
to both flow and return connections from the boiler before
connection to any plastic piping.
The central heating system should be in accordance with BS.6798
and, in addition, for smallbore and microbore systems, BS.5449.
heat Exchanger pressure Loss
Boiler size
12
Boiler
kW
12
Output
But/H 41,100 51,300 61,600 82,600 103,300
Water
l/min
8.6
Flow Rate
g/min
(1.9)
Temp
ºC
20
Differential
ºF
36
Pressure
M.Wg
0.5
Loss
FT.WG
1.7
WaTER TREaTMENT - see Frame 9
BOILER CONTROL INTERLOCKs
Central heating systems controls should be installed to ensure
the boiler is switched off when there is no demand for heating, in
compliance with Building Regulations.
Heating systems utilising full thermostatic radiator valve control
of temperature in individual rooms should also be fitted with a
room thermostat controlling the temperature in a space served by
radiators not fitted with such a valve.
When thermostatic radiator valves are used, the space heating
temperature control over a living / dining area or hallway having
a heating requirement of at least 10% of the minimum boiler heat
output should be achieved using a room thermostat, whilst other
rooms are individually controlled by thermostatic radiator valves.
However, if the system employs thermostatic radiator valves on all
radiators, or two port valves, then a bypass circuit must be fitted
with an automatic bypass valve to ensure a flow of water should
all valves be in the closed position.
Ideal Logic Heat -
Installation and Servicing
general
15
18
24
15
18
24.2
10.7
13
17.2
(2.4)
(2.8)
(3.8)
20
20
20
36
36
36
0.7
1.0
1.6
2.3
3.1
5.2

ELECTRICaL sUppLy

Warning.
This appliance must be earthed.
Wiring external to the appliance MUST be in accordance with
the current I.E.E. (BS.7671) Wiring Regulations and any local
regulations which apply. For IE reference should be made to the
current ETCI rules for electrical installations.
The mains supply to the boiler and system wiring centre shall be
through one common fused double pole isolator. For new heating
systems, and where practicable replacement boiler installation,
the isolator shall be situated adjacent to the appliance.
NOTE. The appliance musT be Wired WiTh a
permanenT live supply. The boiler WarranTy Will
be invalid iF This requiremenT is noT complied WiTh.
CONDENsaTE DRaIN
Refer to Frames 32 & 33
A condensate drain is provided on the boiler. This drain must be
connected to a drainage point on site. All pipework and fittings in
the condensate drainage system MUST be made of plastic - no
other materials may be used.
30
IMpORTaNT.
30.3
Any external runs must be in accordance with BS 6798.
The drain outlet on the boiler is sized for standard 21.5mm (3/4")
21.5
overflow pipe. It is a universal fitting to allow use of different
(4.7)
brands of pipework.
20
36
2.4
8.0
9