Assembly - IDEAL VANGUARD L 170 Installation And Servicing

Hide thumbs Also See for VANGUARD L 170:
Table of Contents

Advertisement

24 DooR ASSEmBLy - VANGuARD L 1100 to 3500
The combustion chamber door is
fitted with four fixing points, two on
the left hand side which are normally
used as hinges.
The right hand side fixings are made
with fastening bolts.
The door mounting can be reversed
so that it hinges from left to right.
However, when reversing the door
the bushing (9), nut (10) and washer
(11) will have to be moved as shown
below (details 1 and 3 for hinge side)
(details 2 and 4 for hinge side).
Door Adjustment
1. Vertical door adjustment: is
possible by means of rotation
of nut after removal of the grub
screw.
2. Transverse door adjustment: is
possible only by loosening the
hinges fixed to the front tube plate
of the boiler and moving them a
little bit sidewards.
3. Further adjustment to the
position of the door in relation to
the chamber can be achieved
through adjustment of the nuts
(12) and counternuts (10).
Vanguard L -
Installation & Servicing
INSTALLATIoN
2
1
3
2
1
3
3
3
3
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents